Day 3
The third day was mainly about the ceiling. With the three of us, it went up fairly easy. We didn't spend much time on anything else besides some minor touch-up and the final guitar. With one more day to work, we figured we would have plenty of time to finish the beds and whatever else was left. So far we had used 1325 square feet of aluminum foil.
